Submitted by Vicky Neal on Mon, 06/09/2025 - 19:06
Inclusions:
- Pre-check prior to delivery and installation.
- Meet the delivery driver and offload materials for onsite storage by others.
- Install Tyvek Flex Wrap sill pan flashing tape at each rough opening sill.
- Install the new products using nailing fin installation method per manufacturers specifications into the rough openings that have been completely prepared by others.
- Tape the nailing fins to the building substrate with Tyvek Straight Flash flashing tape.
- Insulate the shim cavity with OSI window and door spray foam insulation.
- Cut insulation shims off flush with the house framing.
- Clean up and remove all trash and debris associated with this scope of work to an on-site dumpster provided by the GC and leave the work area broom cleaned. If dumpsters are not available, trash to be piled in the garage and removed by others.
Exclusions:
- Framing or modifications of any rough/masonry openings including slot for multi slide threshold
- Supply or installation of any interior trim.
- Paint or stain work.
- Protection of stored or installed materials from damage caused by others.
- Supply or installation of entry door hardware.
- Any item not listed as an inclusion is excluded from the scope of work.
Header Image:

Logo:

Product Location:
Product Category: